BAZI DERAZ
400/230kV AIS Substation

Project Details

Location
SARPOL ZAHAB – KERMANSHAH
End-User
Gharb Regional Electric Company (GREC)
Owner
Gharb Regional Electric Company (GREC)
Consultant
Ghods Niroo
Awarded
June, 2021

SSCO has been short listed as the EPC Contractor for Construction of 400/230kV                 Bazi Deraz Substation in order to power up west region of Iran and east regions of Iraq.

Construction of 400/230kV AIS Substation Including:

  • 2 x Power Transformer 400/230kV, 200 MVA
  • 2 x Feeder 400kV for input transmission line
  • 2 x Feeder for 400kV Trans
  • 2 x Feeder for AIS 230kV Switchgear
  • 400 and 230kV busbars
  • 5 circuit breaker for busbars
  • Ac/DC Panel Equipment
  • Protection, PLC Panel and DCS System Equipment
  • Telecommunication Equipment etc
  • Control System: DCS

Get in Touch

+98 (21) 88 77 32 25
 
Fax