SSCO has been short listed as the EPC Contractor for Construction of 400/230kV Bazi Deraz Substation in order to power up west region of Iran and east regions of Iraq.
Construction of 400/230kV AIS Substation Including:
- 2 x Power Transformer 400/230kV, 200 MVA
- 2 x Feeder 400kV for input transmission line
- 2 x Feeder for 400kV Trans
- 2 x Feeder for AIS 230kV Switchgear
- 400 and 230kV busbars
- 5 circuit breaker for busbars
- Ac/DC Panel Equipment
- Protection, PLC Panel and DCS System Equipment
- Telecommunication Equipment etc
- Control System: DCS